When Aramark won the catering contract for a Premier League club’s new stadium – a complete new build and one of the most high-profile stadium openings in UK football – the mobilisation challenge was unlike anything a standard equipment brief could resolve.

Thirty-seven kitchens. Forty executive boxes. Multiple service formats across each one. A team that needed to deliver consistently from the first service, across every box, to the standard a Premier League stadium demands.

Adam Bateman, Culinary Director at Aramark UK, understands this challenge structurally.

A new stadium opening doesn’t give you time to iterate. There is no soft launch. The first service has to look and perform like the tenth – and every box has to match every other box, regardless of which team delivered it.

One day we’re doing a buffet for 400, the next it’s canapés for 40. The flexibility to move, reset, and repurpose the same equipment is essential.

Flexibility alone, however, is not enough. Without certainty, flexibility creates a different problem — 37 versions of the same setup, each interpreted slightly differently, in different kitchens, under opening-day pressure. 

The brief, in brief: make every setup look the same before the first guest arrives. 

How certainty was designed into the opening 

Aramark worked with Craster using PLAN — Craster’s 3D space visualisation and planning tool — to design and simulate every setup before a single piece of equipment was ordered or delivered to site. 

Layouts were modelled in the planning environment. Every element — frame, tray, riser — was given a defined position within each box and each service format. Bateman’s team could see exactly how each setup would look, how much space it would require and how it would transition between occasions, all before the opening. 

Being able to visually and accurately map out what each setup should look like — that’s what gave us confidence.

This is what PLAN does for a complex mobilisation: it moves uncertainty from opening day — where it is expensive and disruptive — to the design stage, where it costs nothing to fix. 

The STAK and FARE systems then delivered the flexibility Bateman needed across the full range of service formats: 

PLAN also allowed Aramark to show the club exactly what the experience would look like in their specific boxes before any commitment was made. The question stopped being ‘what will it look like?’ and became ‘which configuration do you prefer?’

What changed for Aramark 

The stadium opened as one of the most significant new-build stadium projects in UK football, and Aramark’s mobilisation delivered to standard across all 40 executive boxes from the first service.

For a contract caterer winning new business in the stadia and venue sector, that repeatability is a competitive advantage. The system that delivered this opening can be shown to the next client before the contract is signed – in their space, at their scale, with their service formats already mapped.

Certainty in hospitality doesn’t happen on the day. It’s designed into the space long before the first guest arrives.